What are the reasons for the loss of measurement in water stable mixing station? How to solve?

Views:1     Author:Site Editor     Publish Time: 2020-10-22      Origin:Site

水泥搅拌机

Cement mixer truck

What is the performance of the measurement failure of the water stable mixing station?

Whether the production of water stable mixing station is normal or not, the quality of the project, the high and low cost of material consumption are closely related to whether the metering system can work normally, whether each ingredient scale is accurate. Material measurement misalignment not only affects project quality, but also affects project schedule. Once the bag is blocked, the pressure in the warehouse exceeds the safety pressure of the pressure relief valve at the top of the warehouse, the pressure relief valve can be opened to release the pressure in the warehouse, to prevent the occurrence of the explosion of the warehouse accident. Through the high and low level can observe the warehouse full and short of material. When discharging is needed, the manual unloading valve at the bottom of the cone is first opened, and the cement is then transported out through the cement conveyer.

When the water mixing station is in the process of feeding, if the phenomenon of "arch lifting" occurs, push the button of solenoid valve of arch breaking device in time to blow air, eliminate the "arch lifting" for feeding and ensure smooth cement supply. When the cement conveying device (screw conveyor) fails, first close the manual unloading valve at the bottom of the cone to prevent cement from spilling and causing waste.

The measurement misalignment of the water stable mixing station is usually manifested as the instability, drift, linear supererror and other faults of the batching scales in use. The water stable mixing station is generally caused by the above factors.

Anex Industrial Hong Kong Limited
EZ RENDA Construction Machinery Foshan Limited 
EZ RENDA Engineering & Contracting Co Guangdong Limited 

PRODUCTS

> Plastering Solution
> Rendering Machine
> Cement Sprayer
> Cement mixer
> Plastering tools
> Other related products

CONTACT US

   Ms Angel Wong 
  +86-18665624699
   No 3 of Second Road, Xingren Industrial Zone, Pingzhou, Guicheng, Nanhai, Foshan,China
   +86-757-8676 1735
   sales@ezrenda.com      
   +86-186 6562 4699        
Links:Molan Network
ANEX INDUSTRIAL HONGKONG LIMITED    All rights reserved     Technical Support:Molan Network  

Follow us: